![]() Their construction team took care of all the site work that preceded the installation of the solar trackers: trenching, laying conduit, drilling for, and pouring foundations. JB Steel was also collaborating with Stracker Solar on the solar part of the project. We chose to partner with Stracker Solar because of their unique product that is not only perfectly compatible with parking lots but also the most efficient PV system available”, said Alex Batzer. ![]() department, and location, as well as the employees level of education. “Bringing our clients best-in-class solutions is an essential part of how we do business, and solar is no exception. The national average salary for a Franz Bakery employee in the United States is. Project Manager Alex Batzer saw the opportunity to include solar power generation into the project and involved Stracker Solar to provide a proposal. ft new steel building and its premises was managed by prime contractor JB Steel. The six-Stracker installation was designed to achieve net-zero electric status for the new location while also accommodating possible future electric vehicle charging stations and other operations-related energy demand increases. They generate all the power the location will need after it opens its doors later this summer. ![]() The six elevated dual-axis solar trackers move gracefully with the sun all through the day in the parking lot of the newly built facility. A state-of-the-art solar installation started to produce clean energy for Franz Bakery’s new Outlet Store and Depot in White City, Oregon, at the end of July, 2022. And beyond that you'll see a well-loved Portland icon: the gigantic rotating loaf of bread that designates Franz Bakery, whose intoxicating aroma you can. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |